CONSTRUCTION

DISTRIBUTION DEPARTMENT

Shipment and loading of the final products to the client and/or construction site is undertaken by the Distribution Department. The finished products are packed and loaded in such a way thatdamages (i.e. scratches, bends etc.) are avoided.

DS.ISKRA S.A. allocates permanent personal of individuals with experience of at least fifteenyears in constructing complex and big structures.

With the arrival of the structural members and other components to the construction site, the Construction Department checks based on the provided material list, the quantity and qualityof structural members and jointing material. Following, the experienced construction crews start erection of the building, according to the drawings and specifications, taking all necessary safety precautions.